subject
Engineering, 06.05.2020 02:17 sarbjit879

A masonry facade consisting of 3,800 square feet is to be constructed for a building. The total cost per worker hour is estimated to be $31.50, and the total estimated cost of the labor for this task is $10,500. Assuming 8-hour work days and a crew of six workers, how many days should be allowed to complete this task? What is the production rate that the crew must attain to keep the project on schedule and within the budget?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
For the closed feedwater heater below, feedwater enters state 3 at a pressure of 2000 psia and temperature of 420 °f at a rate of ix10 ibhr. the feedwat extracted steam enters state 1 at a pressure of 1000 psia and enthalpy of 1500 btu/lbm. the extracted er leaves at an enthalpy of 528.7 btu/lbm steam leaves as a saturated liquid. (16) a) determine the mass flow rate of the extraction steam used to heat the feedwater (10) b) determine the terminal temperature difference of the closed feedwater heater
Answers: 3
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 19:20
A21-tooth spur pinion mates with a 28-tooth gear. the diametral pitch is 3 teeth/in and the pressure angle is 20°, find the following values: the addendum, dedendum, circular pitch, tooth thickness, and base circle diameters.
Answers: 2
You know the right answer?
A masonry facade consisting of 3,800 square feet is to be constructed for a building. The total cost...
Questions
question
Spanish, 18.11.2020 16:50
question
Mathematics, 18.11.2020 16:50
question
Biology, 18.11.2020 16:50
Questions on the website: 13722360