5.12 A toll booth on a turnpike is open from 8:00 A. M. to 12 midnight. Vehicles start arriving at 7:45 A. M. at a uniform deterministic rate of six per minute until 8:15 A. M. and from then on at two per minute. If vehicles are processed at a uniform deterministic rate of six per minute, determine when the queue will dissipate, the total delay, the maximum queue length (in vehicles), the longest vehicle delay under FIFO, and the longest vehicle delay under LIFO.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
You know the right answer?
5.12 A toll booth on a turnpike is open from 8:00 A. M. to 12 midnight. Vehicles start arriving at 7...
Questions
question
Mathematics, 18.11.2019 02:31
question
Mathematics, 18.11.2019 02:31
question
Mathematics, 18.11.2019 02:31
question
Mathematics, 18.11.2019 02:31
Questions on the website: 13722367