subject
Engineering, 05.05.2020 08:04 bubster5820

Suppose a computer has bytes of byte-addressable main memory and a cache size of bytes, and each cache block contains 32 bytes.

c) If this cache is direct-mapped, what is the format of a memory address as seen by the cache; that is, the size of the tag field , the size of block field , and the size of the offset field .
d) If this cache is fully associative, what is the format of a memory address as seen by the cache; that is, the size of the tag field , and the size of the offset field .
e) If this cache is 4-way set associative, what is the format of a memory address as seen by the cache; that is, the size of the tag field , the size of set field , and the size of the offset field .

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
question
Engineering, 04.07.2019 18:20
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
You know the right answer?
Suppose a computer has bytes of byte-addressable main memory and a cache size of bytes, and each cac...
Questions
question
Chemistry, 06.05.2021 01:30
question
Mathematics, 06.05.2021 01:30
question
English, 06.05.2021 01:30
question
Mathematics, 06.05.2021 01:30
Questions on the website: 13722361