subject
Engineering, 05.05.2020 05:22 lukeperry

The coating on a 1m x 2m surface is cured by placing it 0.5m below an electrically heated surface of the same dimensions and the assembly is exposed to large surroundings at 300 K. The heater is well insulated on its top side and is aligned with the coated surface. The heater surface has an emissivity of 0.8 and the coating surface has an emissivity of 0.5. During the curing procedure, the heater and coating surfaces are maintained at 700 and 400 K, respectively. Convection effects may be neglected.
Draw the radiation thermal circuit and calculate the electric power, Wel, required to operate the heater.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
question
Engineering, 06.07.2019 03:10
What is the direction and how to operate the lathe?
Answers: 2
You know the right answer?
The coating on a 1m x 2m surface is cured by placing it 0.5m below an electrically heated surface of...
Questions
question
Computers and Technology, 16.11.2021 01:20
question
Mathematics, 16.11.2021 01:20
question
English, 16.11.2021 01:30
question
English, 16.11.2021 02:00
question
Mathematics, 16.11.2021 02:30
question
Mathematics, 16.11.2021 08:10
Questions on the website: 13722360