A completely mixed activated-sludge process is being designed for a wastewater flow of 10,000 m3/d (2.64 mgd) using the kinetics equations. The influent BOD5 of 180 mg/l is essentially all soluble, and the design effluent BOD5 is 20 mg/L. The effluent biosolids concentration is 15 mg/l, of which 80% is volatile and 65% is biodegradable. For sizing the aeration tank, the SRT is selected to be 8 d and the MLVSS 3000 mg/L. The kinetic constants are as follows:
Y=0.6 mg VSS/mg BOD, ka = 0.06 d-1, Ks = 60 mg/L of BOD, and k = 5.0 day-1.
Determine the efficiency of soluble BOD removal, using the formula
E=S0-Se/S0 X 100
Here, S0 is influent soluble BOD concentration and Se is influent soluble BOD concentration.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
You know the right answer?
A completely mixed activated-sludge process is being designed for a wastewater flow of 10,000 m3/d (...
Questions
question
Mathematics, 04.07.2019 01:30
question
Mathematics, 04.07.2019 01:30
Questions on the website: 13722363