7.4 A pretimed four-timing-stage signal has critical lane group flow rates for the first three timing stages of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/ln for all timing stages). The lost time is known to be 4 seconds for each timing stage. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth timing stage?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
You know the right answer?
7.4 A pretimed four-timing-stage signal has critical lane group flow rates for the first three timin...