A process is being developed with the following assumptions for the Fixed and Variable Costs: 1. Fixed Costs: $250,000 2. Variable Costs: $12.85 per Unit 3. Price: $29.99 per Unit Calculated the Break-Even Point for the Process. RECALL, the break-even point is the number of units that you must sell to cover before generating any earnings; therefore, your answer should be entered as an integer (you cannot sell a fraction of a unit!)

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
question
Engineering, 04.07.2019 19:10
The short distance from the objective lens to the object causes problems at high magnification. which of the following is the most serious? a. cleaning the object surface b. positioning the object c. reflection from the object surface. d. illumination of the object
Answers: 1
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
You know the right answer?
A process is being developed with the following assumptions for the Fixed and Variable Costs: 1. Fix...
Questions
Questions on the website: 13722363