subject
Engineering, 11.06.2020 23:57 bnvghnbbb

It is desired to produce 5 cubic yards of concrete with a ratio of 1:1.8:3.5 (by weight) of cement, sand, and gravel. What are the required amounts of the components if 5.5 gallons of water per sack of cement is to be used? Assume the free moisture contents of the sand and gravel are 3% and 0.75% respectively. The specific gravities of the cement, sand, and gravel are 3.15, 2.65, and 2.65 respectively. (1 sack of cement weighs 94lb, and 1ft3 of water=7.48 gallons). Give the answere for cement in

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:20
Find the minimum film thickness for a journal bearing with the data below. shaft diameter, d-50 mm, clearance ratio, cdratio? 0.001, shaft speed, n 2000 rpm; bearing length. i 200 mm; eccentricity ration, ? -0.55. ( note, cdratio-ca/d) the minimum film thickness is um
Answers: 2
question
Engineering, 04.07.2019 18:20
Prove the equivalence between the two statements of the 2nd law of thermodynamics (i.e., a violation of one statement leads to the violatio the other statement)
Answers: 2
You know the right answer?
It is desired to produce 5 cubic yards of concrete with a ratio of 1:1.8:3.5 (by weight) of cement,...
Questions
question
Mathematics, 19.06.2021 20:40
Questions on the website: 13722367