A contractor has been awarded a project to construct a 3 miles long tunnel in a mountainous area. During the five-year construction period, the contractor will need water from a stream near the construction site. A pipeline system is required to convey the water to the construction site and you are asked to choose the best alternative from the following pipe sizes. The pump will operate 2000 hours per year. The pump and pipe's salvage values will cover only the cost of removal at the end of the five years. The lowest interest rate at which the contractor is willing to invest is 8%. Use the present worth method.. 2" 3" 4" 5" Installed cost of pipeline and pump $22,000 $23,000 $25,000 $30,000 Cost per hour for pumping $1.2 $0.65 $0.50 $0.40

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 18:20
Along 8-cm diameter steam pipe whose external surface temperature is 900c connects two buildings. the pipe is exposed to ambient air at 70c with a wind speed of 50 km/hr blowing across the pipe. determine the heat loss from the pipe per unit length. (b) air at 500c enters a section of a rectangular duct (15 cm x 20 cm) at an average velocity of 7 m/s. if the walls of the duct are maintained at 100c. a) the length of the tube for an exit temperature of the air to be 40 0c. b)the rate of heat transfer from the air. c) the fan power needed to overcome the pressure drop in this section of the duct.
Answers: 1
You know the right answer?
A contractor has been awarded a project to construct a 3 miles long tunnel in a mountainous area. Du...
Questions
question
History, 21.07.2019 21:00
question
History, 21.07.2019 21:00
Questions on the website: 13722360