subject
Engineering, 07.07.2020 18:01 jro20

With 10,000 per day who would be the apparent low bidder; Bidder A was $500,000 and estimated completion date of 200 days. Bidder B was $540,000 and a completion day and estimated completion date of 180. 1. Bidder B
2. Bidder A

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 18:20
Avolume of 2.65 m3 of air in a rigid, insulated container fitted with a paddle wheel is initially at 264 k, 5.6 bar. the air receives 432 kj by work from the paddle wheel. assuming the ideal gas model with cv = 0.71 kj/kg • k, determine for the air the amount of entropy produced, in kj/k
Answers: 2
question
Engineering, 04.07.2019 19:20
The process in which the system pressure remain constant is called a)-isobaric b)-isochoric c)-isolated d)-isothermal
Answers: 3
question
Engineering, 06.07.2019 02:30
On solidification from a melt, the polymer polyethylene forms a semi-crystalline spherulite structure. (i) sketch an individual spherulite and label the amorphous and crystalline regions. (ii) draw a schematic to show the changes in specific volume with temperature during cooling from the melt, comparing it to the theoretical extremes of fully crystalline and fully amorphous (indicate tm and tg)
Answers: 2
You know the right answer?
With 10,000 per day who would be the apparent low bidder; Bidder A was $500,000 and estimated comple...
Questions
question
Biology, 23.10.2020 20:10
question
Mathematics, 23.10.2020 20:10
question
Health, 23.10.2020 20:10
Questions on the website: 13722361