For each of the stated conditions, determine the probable production expressed in cubic yards per hour bank measure for a shovel equipped with a 3-cy bucket. The shovel has a maximum digging height of 30 ft. Use a 45-min-hour efficiency factor. question 9.3 on Construction planning and equipment methods


For each of the stated conditions, determine the probable production expressed in cubic yards per h

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
question
Engineering, 04.07.2019 18:20
Water vapor initially at 10 bar and 400 °c is contained within a piston-cylinder assembly. the water lost heat to the surrounding according to isochoric (iso-volumetric) process until its temperature is 150 °c. the water is then condensed isothermally to saturated liquid. for the water as a system, calculate the work in kj/kg
Answers: 2
question
Engineering, 04.07.2019 19:10
10 kg of co2 is initially contained at 400 kpa and 300 k. the gas constant for carbon dioxide is 189 j/lkg k) and has a specific heat ratio, k, of 1.289. isentropic expansion then occurs until the pressure is 200 kpa. a) determine the initial volume of co2 in m. b) determine the final temperature in k. c) determine the work done by the system during the expansion kl.
Answers: 2
You know the right answer?
For each of the stated conditions, determine the probable production expressed in cubic yards per ho...
Questions
question
Social Studies, 21.11.2019 23:31
question
Advanced Placement (AP), 21.11.2019 23:31
question
Mathematics, 21.11.2019 23:31
Questions on the website: 13722367