subject
Engineering, 12.08.2020 05:01 Superstar7180

The cold drawn AISI 1040 steel bar with 25-mm width and 10-mm thick has a 6- mm diameter thru hole in the center of the plate. The plate is subjected to a completely reversed axial load that fluctuates from 12kN to 28kN. Use notch sensitivity of 0.83. Required:
a. Estimate the fatigue factor of safety based on yielding criteria.
b. Estimate the fatigue factor of safety based on Goodman and Morrow criteria.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 18:20
Find the kinematic pressure of 160kpa. for air, r-287 j/ kg k. and hair al viscosity of air at a temperature of 50°c and an absolute (10 points) (b) find the dynamic viscosity of air at 110 °c. sutherland constant for air is 111k
Answers: 3
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
The cold drawn AISI 1040 steel bar with 25-mm width and 10-mm thick has a 6- mm diameter thru hole i...
Questions
question
Chemistry, 18.12.2020 05:00
question
Mathematics, 18.12.2020 05:00
question
Mathematics, 18.12.2020 05:00
question
Arts, 18.12.2020 05:00
question
Mathematics, 18.12.2020 05:00
question
Mathematics, 18.12.2020 05:00
Questions on the website: 13722363