subject
Engineering, 15.08.2020 22:01 suevazpue

A pile has a diameter of 0.4 m and a length of 7 m. A field load test on this pile indicates an ultimate load capacity Q of 300 kN with 70% of the 300 kN load being carried by end-bearing and 30% of the 300 kN load being carried by skin friction. At the time of construction, 0.5 m diameter piles were used instead of 0.4 m diameter piles. Calculate the ultimate load capacity Q and the allowable load capacity Q for the 0.5 m diameter pile using a factor of safety of 2.5.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 18:10
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
You know the right answer?
A pile has a diameter of 0.4 m and a length of 7 m. A field load test on this pile indicates an ulti...
Questions
question
English, 25.08.2019 16:30
Questions on the website: 13722367