Engineering, 23.09.2020 14:01 tae1731

A batch of parts is produced on a semi-automated production machine in a sequential batch production operation. Batch quantity is 300 units. Setup takes 55 min. A worker loads and unloads the machine each cycle, which takes 0.75 min. Machine processing time is 3.46 min/cycle, and tool handling time is negligible. One part is produced each cycle. Determine (a) average cycle time, (b) time to complete the batch, and (c) average production rate.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
question
Engineering, 04.07.2019 18:10
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
question
Engineering, 06.07.2019 03:10
Different between right hand turning tool and left hand turning tool ?
Answers: 1
You know the right answer?
A batch of parts is produced on a semi-automated production machine in a sequential batch production...
Questions
question
Arts, 16.11.2020 19:30
question
Mathematics, 16.11.2020 19:30
question
Biology, 16.11.2020 19:30
question
English, 16.11.2020 19:30
Questions on the website: 13722367