subject
Engineering, 24.09.2020 05:01 Mikkixo3114

Vince asks her friend Maria to review the construction plan of a building. Which part of the construction plan contains abbreviations and signs? A. information block
B.
electrical
c.
title block
D.
schedule

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
You know the right answer?
Vince asks her friend Maria to review the construction plan of a building. Which part of the constru...
Questions
question
Biology, 24.01.2020 19:31
question
History, 24.01.2020 19:31
Questions on the website: 13722362