subject
Engineering, 25.09.2020 03:01 Sbeech7246

Consider two machines with two different instruction sets. Machine A has a 2 GHz clock, and machine B has a 4 GHz clock. The following measurements are recorded upon execution of a program. Machine A Instruction Class
Arithmetic Load/Store Branch
Instruction Count (millions) 10 4 6
CPI 2 3 1
Machine B Instruction Class
Arithmetic Load/Store Branch
Instruction Count (millions) 14 5 8
CPI 2 8 1
For Machine A, what is the average CPI and execution time?
For Machine B, what is the average CPI and execution time?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
You know the right answer?
Consider two machines with two different instruction sets. Machine A has a 2 GHz clock, and machine...
Questions
question
Business, 02.12.2021 18:40
question
Mathematics, 02.12.2021 18:40
question
History, 02.12.2021 18:40
question
Chemistry, 02.12.2021 18:40
question
Spanish, 02.12.2021 18:40
question
English, 02.12.2021 18:40
question
English, 02.12.2021 18:40
Questions on the website: 13722362