subject
Engineering, 28.09.2020 07:01 oreoassassin38

Read Gregor’s brainstorming table. Beginning: My troop decided to hold a car wash, and I was nominated to organize it. Middle: Some troop members were assigned to make colorful posters advertising the event, and others were asked to gather the necessary supplies. End: At the car wash, we formed an assembly line to wash, rinse, and dry the cars, and then collect the money.

Which sentence would best introduce this series of events in a descriptive narrative?

We found enough buckets, rags, sponges, and soap to wash cars all afternoon.
Upon learning that the cost of scout camp had unexpectedly increased, my troop quickly formed a clever plan.
Using colorful paint, we created posters to hold by the side of the road that read, "Car Wash Here Today!"
When the first car rolled into the lot, we were lined up and ready to start our fund-raising. Read Gregor’s brainstorming table.

Beginning: My troop decided to hold a car wash, and I was nominated to organize it. Middle: Some troop members were assigned to make colorful posters advertising the event, and others were asked to gather the necessary supplies. End: At the car wash, we formed an assembly line to wash, rinse, and dry the cars, and then collect the money.

Which sentence would best introduce this series of events in a descriptive narrative?

We found enough buckets, rags, sponges, and soap to wash cars all afternoon.
Upon learning that the cost of scout camp had unexpectedly increased, my troop quickly formed a clever plan.
Using colorful paint, we created posters to hold by the side of the road that read, "Car Wash Here Today!"
When the first car rolled into the lot, we were lined up and ready to start our fund-raising. Read Gregor’s brainstorming table.

Beginning: My troop decided to hold a car wash, and I was nominated to organize it. Middle: Some troop members were assigned to make colorful posters advertising the event, and others were asked to gather the necessary supplies. End: At the car wash, we formed an assembly line to wash, rinse, and dry the cars, and then collect the money.

Which sentence would best introduce this series of events in a descriptive narrative?

We found enough buckets, rags, sponges, and soap to wash cars all afternoon.
Upon learning that the cost of scout camp had unexpectedly increased, my troop quickly formed a clever plan.
Using colorful paint, we created posters to hold by the side of the road that read, "Car Wash Here Today!"
When the first car rolled into the lot, we were lined up and ready to start our fund-raising. Read Gregor’s brainstorming table.

Beginning: My troop decided to hold a car wash, and I was nominated to organize it. Middle: Some troop members were assigned to make colorful posters advertising the event, and others were asked to gather the necessary supplies. End: At the car wash, we formed an assembly line to wash, rinse, and dry the cars, and then collect the mon

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
question
Engineering, 06.07.2019 02:30
A75mm diameter shaft is supported in a journal bearing 75mm long with a diametral clearance of 0. 1mm. it supports a radial load of 1000 n and is lubricated with sae 50 oil at 70°c. find the friction torque and the power loss when the crankshaft rotates at 2900 rev/min.
Answers: 1
You know the right answer?
Read Gregor’s brainstorming table. Beginning: My troop decided to hold a car wash, and I was nomina...
Questions
question
Computers and Technology, 27.07.2019 00:30
question
Mathematics, 27.07.2019 00:30
question
Biology, 27.07.2019 00:30
Questions on the website: 13722362