Engineering, 05.10.2020 16:01 Auriieee

According to the EWR specifications, ___ is responsible for picking up and disposing of debris or rubbish from equipment installed by the electrical contractor on the project.
Select one:
a. The general contractor
b. Contracted laborers
c. The electrical contractor
d. none of these

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:20
Find the minimum film thickness for a journal bearing with the data below. shaft diameter, d-50 mm, clearance ratio, cdratio? 0.001, shaft speed, n 2000 rpm; bearing length. i 200 mm; eccentricity ration, ? -0.55. ( note, cdratio-ca/d) the minimum film thickness is um
Answers: 2
question
Engineering, 06.07.2019 03:30
An ammonia compressor has a 5% clearance volume and displacement rate of 80 l/s and pumps against a condensing temperature of 40°c. for two different temperatures of -10°c and 10°c, compute the mass flow rate of refrigerant assuming the clearance volumetric efficiency applies. discharge specific volume corresponding to-10°c and 10°c are 112.5 l/kg and 95 l/kg, respectively.
Answers: 2
question
Engineering, 06.07.2019 04:30
What does stp and ntp stands for in temperature measurement?
Answers: 3
You know the right answer?
According to the EWR specifications, ___ is responsible for picking up and disposing of debris or ru...
Questions
Questions on the website: 13722360