CHEGG Air flows through a compressor at a steady mass flow rate of 0.5 kg/s. The air enters the compressor at a velocity of 15 m/s, pressure of 101.3 kPa, and specific volume of 0.8m3 /kg. The air exits at a velocity of 10 m/s, pressure of 800 kPa, and specific volume of 0.15m3 /kg. The internal energy of the air is increased by 80 kJ/kg. (a) (8 pts) Drive an equation to calculate the required power starting from the full equation (eq. 1-24) of the law of conservation of energy and calculate the power required to drive the compressor, assuming there is no heat loss due to a cooling system. (b) (2 pts) Describe if

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
question
Engineering, 04.07.2019 18:10
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
CHEGG Air flows through a compressor at a steady mass flow rate of 0.5 kg/s. The air enters the comp...
Questions
question
Social Studies, 25.12.2019 22:31
question
Mathematics, 25.12.2019 22:31
question
Mathematics, 25.12.2019 22:31
Questions on the website: 13722361