subject
Engineering, 16.10.2020 04:01 edtorres5

A work cell is currently operated 2000 hr/yr by a human worker who is paid an hourly rate of $23.00, which includes applicable overhead costs. One work unit is produced in a cycle time of 4.8 min. Management would like to increase output to meet increasing demand and a robot cell is being considered as a replacement for the present manual cell. The cycle time of the proposed cell would be reduced to 4.0 min. The installed cost of the robot plus supporting equipment is $120,000. Power and other utilities to operate the robot will be $0.30/hr, and annual maintenance costs are $2500. Determine: a. the number of parts produced annually by the manually operated cell.
b. cost per part produced.
c. how does the cost per part of the robot cell compare with your answer in part (b), given a 4-year service life, 10% rate of return, and no salvage value.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:20
Water vapor initially at 10 bar and 400 °c is contained within a piston-cylinder assembly. the water lost heat to the surrounding according to isochoric (iso-volumetric) process until its temperature is 150 °c. the water is then condensed isothermally to saturated liquid. for the water as a system, calculate the work in kj/kg
Answers: 2
question
Engineering, 04.07.2019 19:10
Arigid tank contains 10 kg of air at 137 kpa (abs) and 21°c. more air is added to the tank until the pressure and temperature rise to 242 kpa (abs) and 32°c, respectively. determine the amount of air added to the tank. [r-0.287 kj/kg k]
Answers: 3
You know the right answer?
A work cell is currently operated 2000 hr/yr by a human worker who is paid an hourly rate of $23.00,...
Questions
question
English, 09.04.2021 20:00
question
English, 09.04.2021 20:00
question
Mathematics, 09.04.2021 20:00
question
Mathematics, 09.04.2021 20:00
Questions on the website: 13722359