subject
Engineering, 16.10.2020 06:01 xsong3938

The site earthwork in Phase III of Four Hills Landfill project included a 3.0 ft deep cut across an entire 2.5-acre site. Soil was excavated from within the proposed Phase III footprint. The average unit weight of this soil is 118 lb/ft3, and the average moisture content is 9.6%. It also has a maximum dry unit weight of 122 lb/ft3 and an optimum moisture content of 11.1%, based on the modified Proctor test. The excavated soil will be placed on a nearby site and compacted to an average relative compaction of 93%. Compute the volume of fill that will be produced and express your answer in cubic yards.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:20
Agas mixture consists of 8 kmol of h2 and 2 kmol of n2. determine the mass of each gas and the apparent gas constant of the mixture.
Answers: 3
question
Engineering, 04.07.2019 18:20
Ahe-xe mixture containing a 0.75 mole fraction of helium is used for cooling electronics in an avionics application. at a temperature of 300 k and atmospheric pressure, calculate the mass fraction of helium and the mass density, molar concentration and molecular weight of the mixture. if the cooling capacity is 10 l, what is the mass of the coolant?
Answers: 3
question
Engineering, 04.07.2019 18:20
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
You know the right answer?
The site earthwork in Phase III of Four Hills Landfill project included a 3.0 ft deep cut across an...
Questions
question
Mathematics, 08.04.2021 18:40
question
Chemistry, 08.04.2021 18:50
question
English, 08.04.2021 18:50
Questions on the website: 13722362