subject
Engineering, 18.10.2020 15:01 ItzAquaZ1449

This is the text--->Li Construction has been hired to begin demolition on a 46-story, high-rise office building in a dense urban district. Specifically, the company will be conducting a green demolition in which as many construction and demolition materials will be recovered as possible. This is what I'm trying to figure out--->Describe the process by which the company will prepare for the demolition, including how and in what order the company will incorporate structural and nonstructural deconstruction, a deconstruction survey, hazardous waste disposal, and techniques such as undermining and implosion to successfully complete the green demolition. Be sure to note the purpose of each stage and how Li Construction can ensure it uses environmentally friendly and sustainable practices at each stage in order to meet the project goals.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
You know the right answer?
This is the text--->Li Construction has been hired to begin demolition on a 46-story, high-rise o...
Questions
question
History, 26.02.2021 04:50
question
Physics, 26.02.2021 05:00
Questions on the website: 13722361