subject
Engineering, 19.10.2020 14:01 oportela23

PLEASE HELP! If the joist spacing is 16" O. C. and there are no floor openings, how many joists are needed?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:20
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
question
Engineering, 04.07.2019 19:20
Apure substance is a)-mixture of various chemical elements or compounds b)-substance that has a fixed chemical composition throughout c)-mixture that is homogeneous (such as air) d)-all the answers
Answers: 3
You know the right answer?
PLEASE HELP! If the joist spacing is 16" O. C. and there are no floor openings, how many joists are...
Questions
question
Advanced Placement (AP), 03.09.2020 07:01
question
Arts, 03.09.2020 07:01
question
Mathematics, 03.09.2020 07:01
Questions on the website: 13722361