subject
Engineering, 21.10.2020 19:01 kyleighmarie05

Which of the following explains why electrical engineers take classes such as electronic techniques, microelectronic devices, networks, robotics, and integrated circuits? to create safe stable structures
to design chips and circuit boards
to build effective communications systems
to test efficiency of energy usage

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg.k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m.k
Answers: 2
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 06.07.2019 02:30
A12 mm diameter shaft runs in a plain cylindrical bush 30 mm long that is located in an 18 mm diameter hole in a housing. the shaft-inner bush fit is h8 f and the outer bush-housing fit is h7-p6. make a fully cimensioned sketch of the bush with tolerances. find the maximum and minimum clearance or interference for both fits on the inner and outer diameters of the bush
Answers: 3
question
Engineering, 06.07.2019 03:10
List and describe in sequence the operation process steps for boxf machine?
Answers: 1
You know the right answer?
Which of the following explains why electrical engineers take classes such as electronic techniques,...
Questions
question
Mathematics, 07.04.2021 02:10
question
Mathematics, 07.04.2021 02:10
question
Geography, 07.04.2021 02:10
question
Physics, 07.04.2021 02:10
question
Mathematics, 07.04.2021 02:10
question
Mathematics, 07.04.2021 02:10
Questions on the website: 13722367