subject
Engineering, 22.10.2020 06:01 SM141372

If there are 3 boards each requiring 2 screws at each rafter tail, how many screws are needed for the full run of 27 feet?
216 screws
126 screws
162 screws
120 screws

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
question
Engineering, 05.07.2019 23:20
Which one of the following faults cause the coffee in a brewer to keep boiling after the brewing cycle is finished? a. an open circuit in the heating element b. a short circuit at the terminals c. welded contacts on the thermostat d. a leak around the gasket
Answers: 3
question
Engineering, 06.07.2019 02:30
Plot schematically the tensile stress versus strain curves for a typical thermoplastic material at a temperature below its glass transition temperature (tg and at a temperature above its tg, respectively. do the same for a typical thermosetting material. list in a table any differences or similarities between the two materials at t> tg and t < tg, respectively, and relate them to the structures of the two types of polymers
Answers: 3
You know the right answer?
If there are 3 boards each requiring 2 screws at each rafter tail, how many screws are needed for t...
Questions
question
Mathematics, 09.06.2021 20:50
question
Mathematics, 09.06.2021 20:50
question
Mathematics, 09.06.2021 20:50
question
Social Studies, 09.06.2021 20:50
question
Mathematics, 09.06.2021 20:50
question
Mathematics, 09.06.2021 20:50
Questions on the website: 13722359