Temperature fields in fresh and irradiated fuel (section V) Consider two conditions for heat transfer in the pellet and the pellet-clad gap of a BWR fuel pin. • Initial uncracked pellet with no relocation • Cracked and relocated fuel 1. For each combination, find the temperatures at the clad inner surface, the pellet outer surface, and the pellet centerline.
2. Find for each case the volume-weighted average temperature of the pellet. Geometry and material information Clad outside diameter = 12.52 mm Clad thickness = 0.86 mm Fuel-clad diametral gap = 230 pm Initial solid pellet with density = 88% Basis for heat transfer calculations Clad conductivity is constant at 17 W/m "K Gap conductance Without fuel relocation. 4300 W/m2K, With fuel relocation, 31,000 W/ m K ; Fuel conductivity (average) at 95% density Uncracked, 2.7 W/m K , Cracked, 2.4 W/m 'K; Volumetric heat deposition rate: uniform in the fuel and zero in the clad Do not adjust the pellet conductivity for restructuring. Use Biancharia's porosity correction factor (Eq. 8-21). Operating conditions Clad outside temperature = 295°C Linear heat-generation rate = 44 kW/m

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
question
Engineering, 04.07.2019 18:20
Describe one experiment in which the glass transition temperature and melting temperature of a totally amorphous thermoplastic material can be determined. show the relevant experimental results in a diagram which should be properly annotated with the two temperatures clearly marked. what is likely to happen to the curve in the diagram if the amorphous polymer is replaced by a thermosetting type?
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?