subject
Engineering, 09.11.2020 04:30 tamikalove78

In the XYZ Company's automatic screw machine department, five machines are assigned to each operator. On a given job, the machining time per piece is 0.164 hours and the machine servicing time is 0.098 hours. With an operator rate of $12.80 per hour and a machine rate of $14 per hour, calculate the expected cost per unit of output.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
question
Engineering, 04.07.2019 19:10
Aplate of dimensions 3 m x 3 m is placed 0.37 mm apart from a fixed plate. the plate requires a force of 2n to move at speed of 45 cm/s. evaluate the viscosity of the fluid in between the plates
Answers: 3
You know the right answer?
In the XYZ Company's automatic screw machine department, five machines are assigned to each operator...
Questions
question
Mathematics, 10.12.2020 08:30
question
Mathematics, 10.12.2020 08:30
question
English, 10.12.2020 08:30
question
Mathematics, 10.12.2020 08:30
question
Mathematics, 10.12.2020 08:30
question
Social Studies, 10.12.2020 08:30
Questions on the website: 13722359