subject
Engineering, 12.11.2020 20:50 vicky10445

Match the scenario to the term that it represents. perseverance NEED HELP ASAP
An engineer designs a new table made totally from man-
1. made materials that were discovered by a scientist who was
attempting to make a heart valve that can last longer
Despite countless unsuccessful attempts to create an
2.
artificial pancreas, scientist and engineers keep trying.
An engineer attempts to build his prototypes only with wood.
3.
He believes this material is the most eco-friendly.
renewable
synthetic material
NEXT QUESTION
ASK FOR HELP

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:10
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
question
Engineering, 04.07.2019 19:10
Air inially occupying a volume of 1 m2 at 100 kpa, 27 c undergoes three internally reversible processes in series. process 1-2 compression to 500 kpa during which pv constant process 2-3 adiabatic expanslon to 100 kpa process 3-1: constant-pressure expansion to 100 kpa (a) calculate the change of entropy for each of the three processes. (b) calculate the heat and work involved in each process. (c) is this cycle a power cycle or refrigeration cycle?
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Match the scenario to the term that it represents. perseverance NEED HELP ASAP
An engineer de...
Questions
question
Mathematics, 08.06.2021 22:20
question
Mathematics, 08.06.2021 22:20
question
Mathematics, 08.06.2021 22:20
question
Mathematics, 08.06.2021 22:20
question
Chemistry, 08.06.2021 22:20
question
English, 08.06.2021 22:20
question
Physics, 08.06.2021 22:20
question
Mathematics, 08.06.2021 22:20
Questions on the website: 13722362