subject
Engineering, 18.11.2020 01:00 wtwbegay

An approach to a pre-timed signal has 30 seconds of effective red, and D/D/1 queuing holds. The total delay at the approach is 83.33 veh-s/cycle and the saturation flow rate is 1000 veh/h. If the capacity of the approach equals the number of arrivals per cycle, determine the approach flow rate and cycle length.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
You know the right answer?
An approach to a pre-timed signal has 30 seconds of effective red, and D/D/1 queuing holds. The tota...
Questions
question
Mathematics, 12.03.2021 19:40
question
Mathematics, 12.03.2021 19:40
question
Mathematics, 12.03.2021 19:40
question
Mathematics, 12.03.2021 19:40
Questions on the website: 13722367