Engineering, 20.11.2020 05:40 alcantar28eduin

The point at which qualified workers need approved plans to work on electrical equipment is called the O flash protection boundary.
O limited approach boundary.
O restricted approach boundary.
O prohibited approach boundary

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
Apipe with an outside diameter of 15 cm is exposed to an ambient air and surrounding temperature of -20°c. the pipe has an outer surface temperature of 65°c and an emissivity of 0.85. if the rate of heat loss from the pipe surface is 0.95 kw per meter of length, the external convective heat transfer coefficient (h) is: (a) 12.5 w/m"k (b) 18.6 w/mk (c) 23.7 w/mk (d) 27.9 w/mk (e) 33.5 w/mk
Answers: 1
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
You know the right answer?
The point at which qualified workers need approved plans to work on electrical equipment is called t...
Questions
question
Mathematics, 28.11.2021 02:10
question
Mathematics, 28.11.2021 02:10
question
Biology, 28.11.2021 02:10
question
Mathematics, 28.11.2021 02:10
Questions on the website: 13722363