Engineering, 23.11.2020 22:20 mvasquez3122p4vahv
Why are the more strict tools for assessing green products those that demand second- or third-party verification?
The assessment process is more elaborate.
The assessment process takes longer.
The assessment process is more independent,
The assessment process is more adaptable.
Answers: 3
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
Engineering, 04.07.2019 19:10
Afoot bridge is made as a simple deck, 4 m long, with a cross section 2 m (wide) and 20 cm thick, and made of wood. the deck is supported at the two ends. the maximum load allowable on the bridge is 10 tons, provided it is uniformly distributed on the deck. to sense this load, a strain gauge is placed at the center of the bridge and its resistance is monitored. if the sensor has a nominal resistance of 350 s2 and a gauge factor of 3.6, what is the reading of the strain gauge at maximum load? the modulus of elasticity for the wood used in the construction is 10 gpa.
Answers: 2
Engineering, 04.07.2019 19:10
Which of the following is the most important advantage of a large field of view? a. allows larger areas to be examined b. relieves eyestrain c. minimizes parallax errors. d. increases precision in proportion to the in- crease in field of view
Answers: 2
Why are the more strict tools for assessing green products those that demand second- or third-party...
Spanish, 15.12.2019 00:31
History, 15.12.2019 00:31
History, 15.12.2019 00:31
Biology, 15.12.2019 00:31
Mathematics, 15.12.2019 00:31
Mathematics, 15.12.2019 00:31
Social Studies, 15.12.2019 00:31
Mathematics, 15.12.2019 00:31
Mathematics, 15.12.2019 00:31
History, 15.12.2019 00:31