subject
Engineering, 08.12.2020 16:40 anenee1

The concrete contract documents did not specify the removal time. What is the minimum form stripping time required for the forms under the girders in the CRI parking garage concrete deck with motorized carts used on the deck?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Atmospheric air has a temperature (dry bulb) of 80° f and a wet bulb temperature of 60° f when the barometric pressure is 14.696 psia. determine the specific humidity, grains/lb dry air. a. 11.4 c. 55.8 d. 22.5 b. 44.1
Answers: 1
question
Engineering, 04.07.2019 18:10
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
You know the right answer?
The concrete contract documents did not specify the removal time. What is the minimum form stripping...
Questions
question
Health, 29.11.2021 08:30
question
Mathematics, 29.11.2021 08:30
question
Mathematics, 29.11.2021 08:30
Questions on the website: 13722363