subject
Engineering, 20.12.2020 23:00 chloeholt123

Select the correct answer. A construction company got a project to a build a hotel in a sand desert area where the temperature often exceeds 130° F. Which structural
element should they use so that the hotel sustains its structure in such extreme weather conditions?
OA beam
OB
column
OC. truss
OD.
plate
OE.
arch
Reset
Next

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
question
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
question
Engineering, 04.07.2019 19:10
Starting wih an energy balance on a rectangular volume element, derive the one- dimensional transient heat conduction equation for a plane wall with constant thermal conductivity and no heat generation.
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
Select the correct answer. A construction company got a project to a build a hotel in a sand desert...
Questions
question
Mathematics, 12.11.2020 05:10
question
English, 12.11.2020 05:10
question
Mathematics, 12.11.2020 05:10
question
Spanish, 12.11.2020 05:10
question
Mathematics, 12.11.2020 05:10
question
History, 12.11.2020 05:10
Questions on the website: 13722361