The initial ultimate BOD after mixing of the Bergelmir River is 12.0 mg · L−1. The DO in the Bergelmir River after the wastewater and river have mixed is at saturation. The river temperature is 10◦ C. At 10◦ C, the deoxygenation rate constant (kd) is 0.30 day−1 , and the reaeration rate constant (kr) is 0.40 day−1 . Determine the critical point (tc) and the critical DO. tc = 2.88 days. Critical DO = 7.53 mg · L−1

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
You know the right answer?
The initial ultimate BOD after mixing of the Bergelmir River is 12.0 mg · L−1. The DO in the Bergelm...
Questions
question
Biology, 19.10.2021 14:00
Questions on the website: 13722363