Multiple Choice Which option identifies why a geological engineer would be valuable to the project in the following scenario?
An architectural firm in Dubai has been hired to build a skyscraper that will be taller than any other building in the city. The firm is currently
consulting with a geological engineer.
Geological engineers can ensure that the stress of a building is sound.
Geological engineers can design equipment to properly evaluate the site.
Geological engineers can ensure that the materials chosen are the most cost-effective and environmentally sound
Geological engineers can help determine if the soil and structural stability in the building's location are satisfactory

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Apump is used to circulate hot water in a home heating system. water enters the well-insulated pump operating at steady state at a rate of 0.42 gal/min. the inlet pressure and temperature are 14.7 lbf/in.2, and 180°f, respectively; at the exit the pressure is 60 lbf/in.2 the pump requires 1/15 hp of power input. water can be modeled as an incompressible substance with constant density of 60.58 lb/ft3 and constant specific heat of 1 btu/lb or. neglecting kinetic and potential energy effects, determine the temperature change, in °r, as the water flows through the pump.
Answers: 1
question
Engineering, 04.07.2019 18:10
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
You know the right answer?
Multiple Choice Which option identifies why a geological engineer would be valuable to the project...
Questions
question
Mathematics, 27.11.2020 20:10
question
Chemistry, 27.11.2020 20:10
question
Mathematics, 27.11.2020 20:10
question
Mathematics, 27.11.2020 20:20
question
Mathematics, 27.11.2020 20:20
question
History, 27.11.2020 20:20
Questions on the website: 13722367