subject
Engineering, 25.01.2021 16:50 pkot3409

If an elevator repairer observes that cables begin to fray after 15 years, what process might he or she use to create a maintenance schedule for their replacement?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:20
Derive the correction factor formula for conical nozzle i=-(1+ cosa) and calculate the nozzle angle correction factor for a nozzle whose divergence hal-fangle is 13 (hint: assume that all the mass flow originates at the apex of the cone.
Answers: 3
question
Engineering, 04.07.2019 19:10
The short distance from the objective lens to the object causes problems at high magnification. which of the following is the most serious? a. cleaning the object surface b. positioning the object c. reflection from the object surface. d. illumination of the object
Answers: 1
You know the right answer?
If an elevator repairer observes that cables begin to fray after 15 years, what process might he or...
Questions
question
English, 21.10.2020 22:01
question
English, 21.10.2020 22:01
Questions on the website: 13722362