subject
Engineering, 28.01.2021 23:50 lalimares1038

Bonus (15pts)A traffic signal has a 60-second cycle length. For the travel direction of interest, the effective red and green times are 30 seconds each, the arrival rate is constant (i. e. no random fluctuations) at 20 vehs/min and the saturation flow (i. e., the queue discharge rate) is 1 veh/sec. a)Calculate the average delay for the travel direction of interest. b)Assume work on the street is taking place downstream of the intersection so that only 25 vehs/min (in the direction of interest) can pass. Calculate the average delay caused by the street work to a vehicle leaving the intersection. Assume that the queue atthe downstream restriction never backs-up into the intersection.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
question
Engineering, 04.07.2019 18:20
Agas mixture consists of 8 kmol of h2 and 2 kmol of n2. determine the mass of each gas and the apparent gas constant of the mixture.
Answers: 3
question
Engineering, 04.07.2019 18:20
Find the minimum film thickness for a journal bearing with the data below. shaft diameter, d-50 mm, clearance ratio, cdratio? 0.001, shaft speed, n 2000 rpm; bearing length. i 200 mm; eccentricity ration, ? -0.55. ( note, cdratio-ca/d) the minimum film thickness is um
Answers: 2
You know the right answer?
Bonus (15pts)A traffic signal has a 60-second cycle length. For the travel direction of interest, th...
Questions
question
Mathematics, 14.02.2020 21:38
Questions on the website: 13722367