Which project delivery system involves only two parties and one contract? A.
design-build
B.
construction management
C.
open bid
D.
design-bid-build

This is for my Architecture class.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
question
Engineering, 04.07.2019 18:20
Asimple rankine cycle uses water as the working fluid. the water enters the turbine at 10 mpa and 480c while the condenser operates at 6 kpa. if the turbine has an isentropic efficiency of 80 percent while the pump has an isentropic efficiency of 70 percent determine the thermal efficiency
Answers: 1
You know the right answer?
Which project delivery system involves only two parties and one contract? A.
design-build
Questions
question
Mathematics, 28.01.2021 04:20
question
Mathematics, 28.01.2021 04:20
question
Mathematics, 28.01.2021 04:20
question
Mathematics, 28.01.2021 04:20
question
History, 28.01.2021 04:20
Questions on the website: 13722363