Engineering, 16.02.2021 09:00 DwayneLeonard4088

One employee was climbing a metal ladder to hand an electric drill to the journeyman installer on a scaffold about five feet above him. When the victim reached the third rung from the bottom of the ladder he received an electric shock that killed him. The investigation
revealed that the extension cord had a missing grounding prong and that a conductor on the green grounding wire was making
intermittent contact with the energizing black wire thereby energizing the entire length of the grounding wire and the drill's frame.
The drill was not double insulated. What could have been done to prevent this accident?
Stathatay
U
d
f orce
to
ed equipment Grounding conductor program to protect employees on construction sites

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 18:20
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
You know the right answer?
One employee was climbing a metal ladder to hand an electric drill to the journeyman installer on a...
Questions
question
History, 14.04.2020 23:39
Questions on the website: 13722361