1. What is the productivity rate using cycle time for the following information:
I
Type of Wo...
Engineering, 18.02.2021 03:50 devontemiles8868
1. What is the productivity rate using cycle time for the following information:
I
Type of Work – Hauling
Average Cycle Time – 35 Minutes
Truck Capacity – 25 Tons
Crew - One Driver
Productivity Factor - 0.85
System Efficiency – 55 Minutes
per
Hour
Answers: 2
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
Engineering, 04.07.2019 19:10
With increases in magnification, which of the following occur? a. the field of view decreases. b. the ambient illumination decreases. c. the larger parts can be measured. d. the eyepiece must be raised.
Answers: 1
Social Studies, 10.07.2019 16:30
History, 10.07.2019 16:30
Health, 10.07.2019 16:30
History, 10.07.2019 16:30
Geography, 10.07.2019 16:30
History, 10.07.2019 16:30
Social Studies, 10.07.2019 16:30
Biology, 10.07.2019 16:30