subject
Engineering, 23.02.2021 01:30 dinosaur10

Due to crashes at a railroad crossing in Salem, Oregon, an overpass (with a roadway surface 26 ft above the existing road) is to be constructed on an existing level highway. The existing highway has a design speed of 50 mi/h. The overpass structure is to be level, centered above the railroad, and 180 ft long. What length of the existing level highway must be reconstructed to provide an appropriate vertical alignment

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
You know the right answer?
Due to crashes at a railroad crossing in Salem, Oregon, an overpass (with a roadway surface 26 ft ab...
Questions
question
Mathematics, 06.12.2020 22:00
question
Mathematics, 06.12.2020 22:00
question
Mathematics, 06.12.2020 22:00
question
Mathematics, 06.12.2020 22:00
Questions on the website: 13722360