subject
Engineering, 25.02.2021 23:10 emilianacassandra

An engineered system has a hazard rate of 0.01 failure per hour. (a) What is its MTBF? If the same system has an MTBM of 60 hours, an MDT of 20 hours, and an MTTR of six hours, what are its (b) inherent availability and (c) operational availability?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Describe one experiment in which the glass transition temperature and melting temperature of a totally amorphous thermoplastic material can be determined. show the relevant experimental results in a diagram which should be properly annotated with the two temperatures clearly marked. what is likely to happen to the curve in the diagram if the amorphous polymer is replaced by a thermosetting type?
Answers: 2
question
Engineering, 04.07.2019 18:20
Along 8-cm diameter steam pipe whose external surface temperature is 900c connects two buildings. the pipe is exposed to ambient air at 70c with a wind speed of 50 km/hr blowing across the pipe. determine the heat loss from the pipe per unit length. (b) air at 500c enters a section of a rectangular duct (15 cm x 20 cm) at an average velocity of 7 m/s. if the walls of the duct are maintained at 100c. a) the length of the tube for an exit temperature of the air to be 40 0c. b)the rate of heat transfer from the air. c) the fan power needed to overcome the pressure drop in this section of the duct.
Answers: 1
question
Engineering, 04.07.2019 19:20
Air enters a horizontal, constant-diameter heating duct operating at steady state at 290 k, 1 bar, with a volumetric flow rate of 0.25 m°/s, and exits at 325 k, 0.95 bar. the flow area is 0.04 m2. assuming the ideal gas model with k = 1.4 for the air, determine (a) the velocity at the inlet and exit, each in m/s, and (c) the rate of heat transfer, in kw flow rate, in kg/s, (b) the mass kg 0.3
Answers: 2
question
Engineering, 04.07.2019 19:20
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24°c
Answers: 3
You know the right answer?
An engineered system has a hazard rate of 0.01 failure per hour. (a) What is its MTBF? If the same s...
Questions
question
Social Studies, 11.09.2020 03:01
question
Mathematics, 11.09.2020 03:01
question
Mathematics, 11.09.2020 03:01
question
English, 11.09.2020 03:01
question
Mathematics, 11.09.2020 03:01
question
Mathematics, 11.09.2020 03:01
question
Mathematics, 11.09.2020 03:01
question
Business, 11.09.2020 03:01
question
English, 11.09.2020 03:01
question
English, 11.09.2020 03:01
question
Mathematics, 11.09.2020 03:01
question
Social Studies, 11.09.2020 03:01
question
Mathematics, 11.09.2020 03:01
question
Mathematics, 11.09.2020 03:01
question
Mathematics, 11.09.2020 03:01
question
Social Studies, 11.09.2020 03:01
question
History, 11.09.2020 03:01
question
Physics, 11.09.2020 03:01
question
History, 11.09.2020 03:01
question
Mathematics, 11.09.2020 03:01
Questions on the website: 13722367