Mr. Britt is pouring a 36' x 58' concrete pad for a metal building. If concrete costs $123.00 per cubic yard, what will be the cost of the concrete to pour the pad 8 inches
thick? A cubic yard of concrete = 27 cubic feet and Cu. Ft. = T’xW'x L' (Round up
to the nearest cubic yard when calculating concrete needed.) Pls help me
a. $5,047.00
b. $6,396.00
C. $6,564.00
d. $7,329.00

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 18:20
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
You know the right answer?
Mr. Britt is pouring a 36' x 58' concrete pad for a metal building. If concrete costs $123.00 per c...
Questions
question
History, 14.12.2019 01:31
question
Mathematics, 14.12.2019 01:31
question
Mathematics, 14.12.2019 01:31
Questions on the website: 13722359