Engineering, 08.03.2021 03:30 Ashley2466

Assume that Alternator A is supplying power to a load and that Alternator B is to be parallel to Alternator A. After the paralleling has been completed, what must be done to permit Alternator B to shard the load with Alternator A?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
You know the right answer?
Assume that Alternator A is supplying power to a load and that Alternator B is to be parallel to Alt...
Questions
question
Biology, 26.04.2021 07:00
question
History, 26.04.2021 07:00
question
Mathematics, 26.04.2021 07:00
Questions on the website: 13722361