subject
Engineering, 08.03.2021 19:10 reearamrup27

A utility generates electricity with a 36% efficient coal-fired power plant emitting the legal limit of 0.6 lb of SO2 per million Btus of heat into the plant. Suppose the utility encourages its customers to replace their 75-W incandescents with 18-W compact fluorescent lamps (CFLs) that produce the same amount of light. Over the 10,000-hr lifetime of a single CFL. Required:
a. How many kilowatt-hours of electricity would be saved?
b. How many 2,000-lb tons of SO2 would not be emitted?
c. If the utility can sell its rights to emit SO2 at $800 per ton, how much money could the utility earn by selling the SO2 saved by a single CFL?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
question
Engineering, 04.07.2019 19:10
What is the chief metrological difference between measuring with a microscope and with an electronic comparator? a. the microscope is limited to small workpieces.a. the microscope is limited to small workpieces. c. the comparator can only examine one point on the workpiece. d. the microscope carries its own standard.
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
A utility generates electricity with a 36% efficient coal-fired power plant emitting the legal limit...
Questions
question
Mathematics, 26.02.2021 20:40
question
Mathematics, 26.02.2021 20:40
question
Social Studies, 26.02.2021 20:40
Questions on the website: 13722363