Engineering, 21.03.2021 09:40 jaxondbagley

Use the time and location indices shown below to estimate the cost of a building that contains 32500 m2 of floor area. The building is to be constructed 2 years from now in City A. The cost of a similar type of building that contained 48300 m2 was completed last year in City C for a cost of USD 33,085,000.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:10
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
You know the right answer?
Use the time and location indices shown below to estimate the cost of a building that contains 32500...
Questions
question
Chemistry, 07.03.2021 18:10
question
English, 07.03.2021 18:10
Questions on the website: 13722362