A landowner and a contractor entered into a written contract under which the contractor agreed to build a building and pave an adjacent sidewalk for the landowner for $200,000. Later, while construction was proceeding, the landowner and the contractor entered into an oral modification under which the contractor was not obligated to pave the sidewalk but still would be entitled to $200,000 upon completion of the building. The contractor completed the building. The landowner, after discussions with his landscaper, demanded that the contractor pave the adjacent sidewalk. The contractor refused. Has the contractor breached the contract?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
You know the right answer?
A landowner and a contractor entered into a written contract under which the contractor agreed to bu...
Questions
question
Mathematics, 31.08.2020 19:01
question
Mathematics, 31.08.2020 19:01
question
Biology, 31.08.2020 19:01
question
Mathematics, 31.08.2020 19:01
question
Mathematics, 31.08.2020 19:01
Questions on the website: 13722360