1. Draw from memory a detail of a typical slab on grade and list the steps in its production. Why can't the surface be finished in one operation, instead of waiting for hours before final finishing?2. What are control joints and isolation joints? Explain the purpose and typical locations for each in a concrete slab.3. List the steps that are followed in forming and pouring a concrete wall.4. Distinguish one-way concrete framing systems from two-way systems. Are steel and wood framing systems one-way or two-way? Is one-way construction more efficientstructurally than two-way construction?5. List the common one-way and two-way concrete framing systems and indicate the possibilities and limitations of each.6. Why posttension a concrete structure rather than merely reinforce it?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
You know the right answer?
1. Draw from memory a detail of a typical slab on grade and list the steps in its production. Why ca...
Questions
question
Spanish, 26.02.2020 05:00
Questions on the website: 13722362