Engineering, 08.04.2021 23:40 toricarter00

The 30-min unit hydrograph for an urban catchment is given by Time (min) Runoff (m3 /s) Time (min) Runoff (m3 /s) 0 0.0 210 0.66 30 1.4 240 0.49 60 3.2 270 0.36 90 1.5 300 0.28 120 1.2 330 0.25 150 1.1 360 0.17 180 1.0 390 0.00 The following 120-min storm occurs: Time (min) Rainfall excess (cm) 0-30 2.4 30-60 1.5 60-90 3.1 90-120 2.0 Determine the peak runoff (m3 /s) generated by this 120-min storm..

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
You know the right answer?
The 30-min unit hydrograph for an urban catchment is given by Time (min) Runoff (m3 /s) Time (min) R...
Questions
question
English, 09.10.2019 12:30
question
Mathematics, 09.10.2019 12:30
question
Mathematics, 09.10.2019 12:30
Questions on the website: 13722367