25
The following Information is available for a factory,
Daily working hours
8
Numbe...
Engineering, 09.04.2021 14:00 ozzy1146
25
The following Information is available for a factory,
Daily working hours
8
Number of working days in week(s) 6
No of operators 20
Std. Hours per unit of production during a particular week 4
Number of units produced
48
Absentee man days
Idle time due to loadshedding
30 man darys
Find
i) Absenteeism percentage
ii) Labour utilisation percentage
iii) production efficiency of labour
iv) Overall productivity of labour in terms of units produced/week/
employee
Answers: 2
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
Mathematics, 31.05.2021 20:40
Mathematics, 31.05.2021 20:40
Mathematics, 31.05.2021 20:40
Mathematics, 31.05.2021 20:40
Social Studies, 31.05.2021 20:40
History, 31.05.2021 20:40
History, 31.05.2021 20:40